Industry and Resources, Mechanical Engineering

Phase 1 – New pressurized diffuser project & Relocation of hydraulic unit

Client
Domtar
Année
2019

This project to relocate the hydraulic unit at the Domtar mill represents a major milestone in the improvement of this infrastructure. By relocating the hydraulic unit that operates the pressurized diffuser cylinder, we redesigned the layout for optimum efficiency. This relocation required careful relocation of all the high-pressure piping, necessitating precise planning and expert execution. In addition, the associated instrumentation was also carefully relocated to ensure seamless integration. Our team successfully met this challenge, demonstrating our ability to orchestrate complex projects while maintaining operational reliability. This initiative reinforces our commitment to innovation and to optimizing our facilities for maximum performance.